Questions or need a quote?

Request a quote for a standard product, a custom product, or ask us a question.

Contact Us

History

The first CDI building, way back in the day...

1959 Ethylene Gulf Coast is established. One of the first companies to incorporate double-tooling which allowed us to produce parts at a much faster rate than competitors. The company initially made gaskets and o-rings.

1960s Extrusion and compression molding capabilities are added.

1968 Material blending capabilities are added.

1976 Fibrex® bearings are introduced.

1980s Manufacturing and designing diaphragms begins.

1980s Melt molding, auto-molding, and isostatic molding capabilities are acquired.

1992 Paradyne® product line for HPLC seals is started.

1992 1500-ton large diameter (up to 110”) compression molding press is acquired.

1993 XC2 winding equipment is purchased and process is licensed. This material is specifically used to make parts for the compressor industry.

1998 First Class 1000 clean room is certified.

2000 Manufacturing semiconductor equipment process components is started.

2005 Approved as PAI (Torlon®) certified injection molder.

2006 EGC is purchased by Fenner and becomes a part of Fenner Advanced Sealing Technologies.

2007 EGC’s new facility is constructed with 230,000 sq. ft. of manufacturing space.

2011 New robotics are added to manufacturing.